Skip to main content
On the Critical Path (1971)
 
Loading... Playback error. Retrying...Error loading Video. Please try again later. Buffering...Now Playing: On the Critical PathPaused: On the Critical Path
Poster Image
Rated: 7 out of 10 with 1 votes.
Watch On the Critical Path (1971) : Full Movie Online Free Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.
Show More
Show Less
7 PG Canada ONF | NFB Trailer
Main Actors:
Directed by:
Release Date:
Genres:Comedy
Keywords:Sibling-Relationshipnuclear power, candu
You may also like these Movies:
Inside Chernobyl with Ben Fogle
2021
7.6
Seabrook 1977
1978
0
Radioactive: The Women of Three Mile Island
2024
6.3
Wolsong: Vanishing Town
2019
0
Uranium Drive-In
2013
0
Inside The Atom
1948
0
Th (Part 11:  Dr. Helen Caldicott)
2014
5.1
The Atom: A Love Affair
2019
6.5
Nuclear Now
2023
7.1
Elektro-Lähmung - Ein Film gegen die politische Ohnmacht
1989
0
On Power Refuelling
1971
7
Nuclear Power Demonstration
1963
0
This Nuclear Age
1973
0
The Battle of Chernobyl
2007
7.519
Reconstruction of the NRX Reactor 1970
1973
8
Nuclear Fuel Waste Management
1979
0